Werner Implement, Inc. | 119 Main Street East | Vermillion, MN 55085 | 651.437.4435 | 1.800.770.4634
Under construction!
This is the seventh page of photos in our construction album.

In early July, the front entrance began to take shape. The entire facade is constructed of heavy steel beams covered with colored steel sheets. It took workers a long time to fit and fasten all the intricate pieces required to construct the roof-like structure. While lights installed in the soffits enhanced the ambiance, they complicated the task. Meanwhile, the new 5-ton overhead crane arrived by truck. Amazingly, it didn't take long for workers to position the heavy bright yellow beam in the shop, then carefully hoist it in place by two hefty fork lifts. The crane will ride on heavy tracks as it slides back and forth the length of the shop. Once the beam was in place, workers had to install the complex electrical system that feeds power to the unit regardless of its location in the shop. By early August, the new front was nearly complete. At some point, a new sign bearing the company name and the New Holland logo will be attached to the front structure. Work on the rest of the shop, both outside and inside, was nearing completion.Photos on this page were taken between July 10 and Aug. 5, 2015.

To simplify viewing, we've created pages, much like a photo album. The link to the next page is on the bottom of each page.

The last photo showing the shop's entrance was taken in November 2017. We're still awaiting our new sign, which is scheduled to be delivered early in 2018. Once the sign is installed, the new building will be complete. Thank you.